Tyre work done!

Another few days have now passed, and we have gotten a lot of stuff done! The 10th course of tyres is in, and we have bolted pins into the top three layers of tyres, and cemented the pins into a bond beam at the top.

IMG_8008

As per usual, the bottle bricks are heaping up at a staggering paste.

IMG_7859

The next big thing is that we have now put the roofing and post in to the building, and are also building door frames and other details.

IMG_7931

Today was also the first day of packing the spaces in the wall with cement and the left over parts of the bottles, which was a lot of fun!

 

IMG_8003

 

IMG_8010

2 thoughts on “Tyre work done!

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>